CN EN
Special construction
As an experienced EPC general contracting expert for prefabricated buildings, Matechstone boasts nearly 100 EPC special subcontracting management teams as well as one-stop service practical experience in professional design of components, production and transportation, on-site assembly technology management, and project progress management. As of the end of 2018, the company has completed construction projects with prefabricated special EPC construction area of over 4.5 million square meters, including public buildings, residential buildings, and industrial buildings.

By virtue of “scientific, standard, normalized and refined” special EPC capabilities for prefabricated buildings, Matechstone won provincial and municipal honors including “Shanghai Prefabricated Building Demonstration Project”, “Shanghai Prefabricated Building Advanced Collective”, and “Outstanding Contributors to Industrial Modernization of Construction Industry in Jiangsu”.
Through years of practices in various types of prefabricated projects such as commercial real estate, affordable housings and office buildings, we are deeply aware of the fact that the design, production and construction of prefabricated buildings are integrated. Prefabricated hoisting is not only construction section with strong professionalism, but also demands the adequate consideration of construction organization plan of hoisting section during design stage.

Related performance

Public buildings
Residential buildings
Industrial parks
Municipal bridges and tunnels
Wind Power Concrete Tower
The Second Headquarter of China Electronics (HDSC)
Total floorage above ground:
46,700
Individual precast rate:
40 %
Project address: Intersection of Shenjiang Road and Zhongke Road, Zhangjiang Town, Pudong New District, Shanghai
Prefabricated structural system: prefabricated monolithic frame structure system
Precast components: precast columns, precast beams, composit
Kunshan Open University
Total floorage above ground:
162,082
Individual precast rate:
20 %
Project address: West of Suzhou Belt Freeway East Line, South of 312 National Road Auxiliary Lane, East of Xincheng South Road and North of Chenfeng Road, High-tech District, Kunshan
Prefabricated structural system: Prefabricated monolithic concrete shear
Project of Kindergarten on Huoju Road, High-tech District, Chang
Total floorage above ground:
19,903
Individual precast rate:
30 %
Project address: On the south side of Gufang Road and the east side of Huoju Road, Wujin National High-tech Zone, Changzhou.
Prefabricated structural system: prefabricated monolithic frame structure system
Precast components: precast columns, precast be
Project of Lot 19A-03A, Unit MHC10204,Minhang New Town, Shanghai
Total floorage:
62,800
Individual precast rate:
30 %
Project address: Intersection of Qishen Road and Xiuwen Road, Shenzhuang Town, Minhang District, Shanghai.
Prefabricated structural system: prefabricated monolithic frame structure system + Decorative integrated out-hung wall
Precast components Precast e
Management Houses of Changgouhe Park in Wujin District, Changzho
Total floorage:
1,843.8
Individual precast rate:
30 %
Project address: South of Renmin Middle Road, west of Changgouhe Road, Changzhou
Prefabricated structural system: prefabricated monolithic frame structure system + precast out-hung wall with sandwich thermal insulation
Precast components: precast columns
Project of Lot D, Changzhou Yulan Plaza of Sunac
Total floorage:
140000
Individual precast rate:
20 %
Project address: East of Changgou Road, West of Yutang Road, South of Datong River, North of Datong East Road, Wujin District, Changzhou City
Prefabricated structural system: Prefabricated monolithic concrete shear wall structure
Precast components: Prec
Newly-built Dianshan Lake Welfare Home Project in Qingpu Distri
Floorage:
40965
Overall precast rate:
41.3 %
Project name: Newly-built Dianshan Lake Welfare Home Project in Qingpu District, Shanghai
Prefabricated system: frame structure system
Component types: precast slabs, precast beams, precast columns
Wireless Valley Science Park Project
Floorage:
123130.62

Project name: Wireless Valley Science Park Project
Prefabricated system: Shear wall structure system
Component types: Precast composite slabs, precast columns, precast beams, precast stairs
School Training Center Project
Floorage:
34943.14
Overall assembly rate:
32.02 %
Project name: School Training Center Project
Prefabricated system: Precast frame structure system
Component types: Floor slabs, stairs, precast columns, precast beams
Nanjing Jinmao Shangfang G71 Project
Floorage:
100600
Overall assembly rate:
50 %
Prefabricated system: Shear wall structure system
Component types: Floor slab, stairs, wall panels, breast boards, parapet walls
total proportion of 60% for the three boards
The Luxury Mansion
Total floorage above ground:
155,200
Individual precast rate:
20 %
Project address: East of Huayuan Street, North of Renmin Middle Road, Hutang Town, Wujin District, Changzhou
Prefabricated structural system: Prefabricated monolithic shear wall structure
Precast components: Precast shear walls, composite floor slabs, In
Project of NO.2017G61 Lot, Shangfang Street, Nanjing
Total floorage above ground:
111439.14
Individual precast rate:
50 %
Project address: Shangfang Street, Jiangning District, Nanjing
Prefabricated structural system: Prefabricated monolithic concrete shear wall structure
Precast components: composite floor slabs, precast walls, precast stairs, precast balconies, etc.
Jiashan Haishang Fenghua Garden Phase II
Total floorage above ground:
13,1084
Individual precast rate:
20 %
Project address: Intersection of Shiji Avenue and South Station Road, Jiashan County, Zhejiang Province
Prefabricated structural system: Prefabricated monolithic concrete shear wall structure
Precast components: Precast composite floor slabs, precast sta
Binjiang Park No. 1
Total floorage above ground:
120,500
Individual precast rate:
30 %
Project address: Core Residential Area, Qilian Section, Baoshan, Shanghai
Prefabricated structural system: Prefabricated monolithic concrete shear wall system
Precast components: precast walls, bay windows, composite floor slabs, precast stairs, etc.
Nanjing G79 Lot Project
Floorage:
80624
Overall assembly rate:
50 %
Prefabricated system: Shear wall structure system
Component types: Floor slab, stairs
total proportion of 60% for the three boards
Kangshan Country Garden Project of Wuxing, Huzhou
Floorage:
121251.04
Overall assembly rate:
32.02 %
Project name: Kangshan Country Garden Project of Wuxing, Huzhou
Component types: Floor slabs, stairs, balcony slabs, air-conditioning panels, precast exterior wall panel with non-sandwich thermal insulation (straight), bay windows
Real Estate Development Project of Lot No. 391-2 of Deqing Wuyan
Floorage:
187751.47
Overall assembly rate:
30.92 %
Project name: Real Estate Development Project of Lot No. 391-2 of Deqing Wuyang Street (2017)
Prefabricated system: Shear wall structure system
Component types: Shear walls, precast balconies, Precast composite slabs, precast stairs
Deqing ZL Yueshan Mansion Project
Floorage:
122237.39
Overall precast rate:
30.97 %
Prefabricated system: Shear wall structure system
Component types: Shear walls, composite slabs, precast stairs, precast balconies
Project of Lot No. 2017-WG-66 of Sudi
Floorage:
18044.6
Overall assembly rate:
30.58 %
Project name: Project of Lot No. 2017-WG-66 of Sudi
Prefabricated system: Shear wall structure system
Component types: composite slabs, precast stairs
Project of Lot No. 2017-WG-68 of Sudi
Floorage:
51828.28
Overall assembly rate:
34.58 %
Prefabricated system: Shear wall structure system
Component types: composite slabsprecast stairs
Project of Lot No. 2017-WG-68 of Sudi
Floorage:
180456
Overall assembly rate:
30.58 %
Prefabricated system: Shear wall structure system
Component types: composite slabs precast stairs
Project of Lot No. 2017-WG-67 of Sudi (Landsea Sunnyhome Project
Floorage:
51828.28
Overall assembly rate:
34.58 %
Prefabricated system: Shear wall structure system
Component types: composite slabs, precast stairs
Development and Construction Project of Lot No. RHS-03-04-C-2 in
Floorage:
205030.15

Project name: Development and Construction Project of Lot No. RHS-03-04-C-2 in Renhuangshan Sub-District
Component types: Exterior walls, bay windows, composite slabs, balcony slabs, air-conditioning panels
Project of Lot No. 3-2, Xinnonghe, Dongjing Town, Songjiang Dist
Floorage:
104036.36

Component types: Exterior walls, bay windows, composite slabs, balcony slabs, air-conditioning panels, decorative columns, columns, beams, stairs, shear walls
Shangfang Street, Jiangning District, Nanjing
Total floorage above ground:
111439.14
Individual precast rate:
30 %
Prefabricated structural system: Prefabricated monolithic concrete shear wall structure
Precast components: composite floor slabs, precast walls, precast stairs, precast balconies, etc.
Precast assembly rate: 50%
1.Project name: Phase II project of Life Health Industrial Insti
Floorage:
18044.6
Precast rate:
30 %
Structural system: prefabricated monolithic frame structure
Precast component types: precast beams, composite floor slabs, precast stairs。
Intelligent Production Project of Furniture and Cabinet Parts of
Floorage:
34000
Precast rate:
40 %
Structural system: prefabricated monolithic frame structure
Precast component types: precast beams, composite floor slabs, precast stairs。

Changzhou-Yixing Expressway Project
Project address:
Changzhou-Yixing Expressway CY-CZ2 Construction Section Route
Precast components:
Precast concrete three-slab open side trench , lining arch preca
Production and construction unit: Changzhou Matechstone Architectural Technology Co., Ltd.
Xinjiang Laojunmiao Wind Power Project
Project address:
Laojunmiao Generating Area, Mulei County, Xinjiang
Precast components:
Precast reinforced concrete tower
Production and construction unit: Matechstone Engineering Group Co.,Ltd.